Power transformers & substation equipment for Uzbekistan

Manufacturing

A 27,934 m² production base in Pizhou, Jiangsu — transformers, switchgear and box-type substations from one manufacturer.

Factory

A modern plant for transformers and switchgear

Our manufacturing base, Jiangsu Xinhong Electrical Equipment Co., Ltd., was founded on 18 October 2018 in the hardware-machinery industrial park of Nianzhuang Town, Pizhou, Jiangsu Province. The site covers 27,934 m² with 15,246 m² of buildings, employs more than 100 people and produces power transformers, high- and low-voltage switchgear assemblies, box-type substations and prefabricated cabin substations.

The plant has invested continuously in process equipment: coil winding lines, a vacuum epoxy-casting line for dry-type transformers, vacuum drying ovens, CNC sheet-metal machining for tanks and cabinets, and a shielded high-voltage partial-discharge test room. Annual turnover is about RMB 230 million.

Management systems are certified to ISO 9001, ISO 14001 and ISO 45001; the XL, GGD, GGJ and XMCS-K low-voltage switchgear assemblies carry CCC certification and the company holds a national high-tech enterprise certificate.

A modern plant for transformers and switchgear

Precision equipment

Key process equipment at our manufacturing base.

Foil and wire winding machines

Horizontal winding machines for LV foil windings and HV wire windings — uniform, compact coils with low stray losses.

Vacuum epoxy-casting line

Cast-resin dry-type coils (SCB10 – SCB18) are cast under vacuum in epoxy resin for void-free insulation.

Vacuum drying ovens

Active parts are dried under vacuum before oil filling; oil is degassed and filtered on site.

Core cutting and step-lap stacking

Grain-oriented and amorphous-alloy cores with step-lap joints for low no-load loss and noise.

HV partial-discharge shielded test room

Applied and induced voltage tests and loss measurements on every unit, plus partial-discharge measurement on dry-type and 35 kV units, in a shielded comprehensive test centre.

CNC sheet-metal shop

Turret punch presses and press brakes for corrugated tanks, switchgear frames and substation enclosures.

Automated test benches

Computer-controlled test benches record every routine test result for traceability.

Switchgear assembly and commissioning bays

Wiring, protection-relay configuration and functional tests of KYN, GCS, GGD and MNS assemblies before dispatch.

Production process

From raw material to shipped transformer.

  1. 01

    Core and coil winding

    Grain-oriented silicon steel is cut and step-lap stacked; copper foil and wire windings are produced on CNC winding machines with exact turn and tension control.

  2. 02

    Insulation and vacuum drying

    Windings are insulated, pre-dried and vacuum-dried so the moisture content of the active part stays far below the limit required by the standard.

  3. 03

    Epoxy casting / tanking

    Dry-type coils are vacuum-cast in epoxy resin; oil-immersed active parts are fitted into corrugated tanks and vacuum-filled with degassed transformer oil.

  4. 04

    Final assembly

    Bushings, tap changer, protection devices and accessories are installed; every unit is checked against the drawing and the customer's specification.

  5. 05

    Testing and dispatch

    Routine tests in the high-voltage partial-discharge shielded test room, then export packing and dispatch to Central Asia with the test report.

Factory video tour

Short clips filmed on the shop floor — winding, assembly, drying, testing.

Testing and quality control

Every transformer passes routine tests before shipment; type tests are performed by accredited national laboratories.

Routine tests (every unit)

  • Measurement of winding resistance
  • Voltage ratio and vector-group check
  • Short-circuit impedance and load loss
  • No-load loss and no-load current
  • Separate-source (applied) AC withstand voltage test
  • Induced AC withstand voltage test
  • Partial-discharge measurement (dry-type and 35 kV units)
  • Tank tightness / pressure test and oil tests (oil-immersed)
  • Functional test of tap changer, protection and accessories

Type and special tests

  • Temperature-rise test
  • Lightning impulse test
  • Short-circuit withstand test
  • Sound-level measurement
  • Energy-efficiency verification to GB 20052
  • Zero-sequence impedance and harmonic measurements (dry-type units)
  • Type tests of switchgear and box substations (temperature rise, dielectric, short-time withstand, IP/IK)

Tests follow GB/T 1094 (IEC 60076), GB/T 10228 (dry-type), GB 20052 (energy efficiency), GB/T 3906 / IEC 62271-200 (HV switchgear), GB/T 7251 / IEC 61439 (LV assemblies) and GB/T 17467 / IEC 62271-202 (prefabricated substations). Test reports are issued in Chinese; English and Russian translations are provided on request.

Photo gallery

Send us your specification — get a technical offer within 24 hours

Tell us the capacity, voltage, vector group and delivery location. Our engineers will propose the right model, price and delivery time to Uzbekistan.