Power transformers & substation equipment for Uzbekistan

Box-type substations (KTP)

ZGS American-type and YB European-type compact substations, prefabricated cabin substations

3 products

Factory-assembled compact substations (KTP) combine the medium-voltage switchgear, the transformer and the low-voltage distribution board in one weather-proof enclosure — delivered tested and ready to connect. The ZGS American-type unit integrates the transformer tank with a compact HV and LV compartment for a smaller footprint; the YB European-type substation offers walk-in compartments, more LV feeders and easier maintenance. Prefabricated cabin substations house complete 10 – 35 kV switchgear rooms, protection and SCADA panels for larger sites.

Typical configurations: 10 kV incoming with load-break switch or vacuum circuit breaker, 50 – 2500 kVA oil-immersed or dry-type transformer, LV board with ACB / MCCB feeders, metering, capacitor compensation, heating and ventilation for −40 °C … +45 °C. Enclosures in galvanised steel, stainless steel or aluminium-zinc sheet with anti-corrosion painting.

  • Delivered assembled and tested — days instead of weeks on site
  • 10 / 0.4 kV up to 2500 kVA; 35 kV prefabricated cabins on request
  • Type-test report for the European-type YB substation
  • Heating, ventilation and IP54 execution for the Uzbek climate

KTP, KTPN and BKTP: which substation to choose

KTPN is the GOST name for an outdoor compact transformer substation and BKTP for a block-type (modular) substation in a concrete or steel enclosure. We supply factory-built KTP for 10/0.4 kV, 30–2500 kVA: compact ZGS American-type (kiosk KTPN), YB European-type with a service corridor, and BMP prefabricated cabins for PV plants and industrial sites.

ModelGOST equivalentTypical use
ZGSKTPN (КТПН), kioskResidential areas, streets, small plots
YBKTPN / BKTP (КТПН / БКТП)Industrial sites, housing, up to 2500 kVA
BMPBKTP (БКТП), modularPV plants, temporary and remote sites

Equipment is built to GB / IEC standards; a statement of compliance with the GOST / O‘zDSt requirements in your project is prepared on request.

Frequently asked questions

What is included in a KTP?

An HV section (load-break switch or vacuum circuit breaker), a 50–2500 kVA oil-immersed or dry-type transformer, a 0.4 kV board with outgoing feeder breakers, metering, reactive-power compensation as specified, heating and lighting. The KTP ships factory-assembled and tested.

How much does a 10/0.4 kV box-type substation cost and how do I get a price?

The price depends on rating, voltages, vector group, loss level and scope. Send the rating, HV/LV voltages, quantity and delivery point via the form, email or Telegram / WhatsApp — a techno-commercial offer with price and lead time follows within one business day.

What is the lead time to Tashkent?

Standard transformers are built in 20–35 days after the advance payment, KTP and switchgear in 30–45 days. Rail or road delivery to Tashkent via Khorgos / Alashankou and Kazakhstan usually takes 15–25 days. FOB, CIF or DAP Tashkent.

Send us your specification — get a technical offer within 24 hours

Tell us the capacity, voltage, vector group and delivery location. Our engineers will propose the right model, price and delivery time to Uzbekistan.