Power transformers & substation equipment for Uzbekistan

High-voltage switchgear 10 – 35 kV

KYN28A-12 and KYN61-40.5 metal-clad switchgear, XGN15 / HXGN15 ring main units, SRM16 gas-insulated switchgear

5 products

Metal-enclosed switchgear for 6 – 10 kV (12 kV class) and 35 kV (40.5 kV class) distribution: withdrawable metal-clad KYN28A-12 and KYN61-40.5 cubicles with vacuum circuit breakers for substations and industrial main distribution, compact XGN15-12 / HXGN15-12 ring main units with SF6 or vacuum load-break switches for ring networks and box substations, and the SRM16-12 gas-insulated switchgear for a smaller footprint and maintenance-free operation.

Cubicles are supplied with the protection relays, instrument transformers, surge arresters, earthing switches and interlocks specified for your project, and are designed and built to GB/T 3906 / IEC 62271-200; the KYN28A-12 cubicle has a type-test report. Circuit breakers from Chinese manufacturers or ABB / Schneider on request.

  • Withdrawable vacuum circuit breakers 630 – 4000 A, up to 31.5 kA
  • Five mechanical interlocks against mis-operation
  • Type-test report for the KYN28A-12 cubicle; built to GB/T 3906 (IEC 62271-200)
  • Relay protection, metering and SCADA interfaces to your specification

KRU, KSO and KRUE 6–35 kV: model cross-reference

GOST-based projects name 6–10 kV cubicles KRU (withdrawable, vacuum breakers), KSO (fixed single-sided cubicles) and KRUE (SF6 gas-insulated). KYN28A-12 is a 10 kV withdrawable KRU up to 4000 A / 31.5 kA, KYN61-40.5 a 35 kV KRU, XGN15-12 and HXGN15-12 are RMUs for cable rings and KTP, and SRM16-12 is a gas-insulated KRUE.

ModelGOST equivalentTypical use
KYN28A-12KRU (КРУ) 6–10 kVMain substations, industrial switchrooms
KYN61-40.5KRU (КРУ) 35 kV35 kV substations, PV plants
XGN15-12 / HXGN15-12KSO (КСО) / RMU 10 kVCable rings, KTP
SRM16-12KRUE (КРУЭ) 10 kVTight rooms, dust and humidity

Equipment is built to GB / IEC standards; a statement of compliance with the GOST / O‘zDSt requirements in your project is prepared on request.

Frequently asked questions

What is the difference between KRU and KSO / RMU?

KRU (e.g. KYN28A-12) are compartmented cubicles with a truck-mounted withdrawable breaker and full interlocking, used in main substations and industrial switchrooms. KSO cubicles and RMUs (XGN15-12, HXGN15-12) are fixed units with load-break switches or vacuum breakers — cheaper and more compact, for cable rings and KTP.

How much does a 10 kV switchgear panel cost and how do I get a price?

The price depends on rating, voltages, vector group, loss level and scope. Send the rating, HV/LV voltages, quantity and delivery point via the form, email or Telegram / WhatsApp — a techno-commercial offer with price and lead time follows within one business day.

What is the lead time to Tashkent?

Standard transformers are built in 20–35 days after the advance payment, KTP and switchgear in 30–45 days. Rail or road delivery to Tashkent via Khorgos / Alashankou and Kazakhstan usually takes 15–25 days. FOB, CIF or DAP Tashkent.

Send us your specification — get a technical offer within 24 hours

Tell us the capacity, voltage, vector group and delivery location. Our engineers will propose the right model, price and delivery time to Uzbekistan.