ZGS-PV PV / wind step-up box-type substation
- 0.8 kV → 10 / 35 kV
- up to 6300 kVA
Step-up box substations for PV and wind, PCS booster stations and integrated cabins for battery storage
Nothing found. Try another model or capacity, or contact us.
Uzbekistan is adding gigawatts of solar capacity, and every plant needs step-up equipment between the inverters and the grid. We supply the following products made by Jiangsu Xinhong: PV / wind step-up box-type substations (0.8 kV → 10 / 35 kV, up to 6300 kVA) with split-winding transformers for two inverters, Chinese-, European- and American-type box substations, energy-storage converter (PCS) booster stations and integrated cabins that combine the PCS, transformer, switchgear and auxiliary systems in one factory-tested unit, plus inverter + step-up integrated substations and prefabricated cabin substations for the main distribution of the plant.
Units are designed for desert conditions — high ambient temperature, dust and sand, wide day/night temperature swings — with IP54 enclosures, forced ventilation or air-conditioning, dust filters and remote monitoring.
A solar plant needs a step-up substation between the inverters and the grid: 0.8 kV → 10 or 35 kV, usually with a split-winding transformer. Battery energy-storage systems (BESS) need PCS booster stations. Desert design: IP54, forced ventilation or air-conditioning, dust filters and remote monitoring.
| Model | GOST equivalent | Typical use |
|---|---|---|
| ZGS-PV / Huashi | PV step-up KTP | PV and wind, 0.8/10/35 kV up to 6300 kVA |
| PV-ISU | inverter step-up KTP | Inverter and transformer in one unit |
| ESS-EU / CMT1-PWS / CHT1-PWS | BESS PCS booster station | Energy storage, 0.4–35 kV |
| ESS-CABIN | containerised BESS | Ready 10 ft / 20 ft cabin |
Equipment is built to GB / IEC standards; a statement of compliance with the GOST / O‘zDSt requirements in your project is prepared on request.
Yes. Step-up substations and BESS stations are built with IP54 enclosures, forced ventilation or air-conditioning, dust filters and anti-corrosion paint; the transformer is rated for the high ambient temperature and daily swings stated in your specification.
The price depends on rating, voltages, vector group, loss level and scope. Send the rating, HV/LV voltages, quantity and delivery point via the form, email or Telegram / WhatsApp — a techno-commercial offer with price and lead time follows within one business day.
Standard transformers are built in 20–35 days after the advance payment, KTP and switchgear in 30–45 days. Rail or road delivery to Tashkent via Khorgos / Alashankou and Kazakhstan usually takes 15–25 days. FOB, CIF or DAP Tashkent.
Tell us the capacity, voltage, vector group and delivery location. Our engineers will propose the right model, price and delivery time to Uzbekistan.