Power transformers & substation equipment for Uzbekistan
Integrated box-type substation

PV-ISU Inverter and step-up integrated box-type substation

One box for inversion and step-up: PV inverter, transformer and 10 / 35 kV switchgear pre-assembled to cut site work and losses.

Voltage
0.8 kV → 10 / 35 kV
Rated capacity
project-specific
Frequency
50 Hz
Standards
GB/T 17467 (IEC 62271-202), GB/T 1094 (IEC 60076), GB/T 3906 (IEC 62271-200), GB/T 7251 (IEC 61439), GB/T 37408
Request a quote

Overview

The inverter and step-up integrated box-type substation belongs to the field of substation equipment. It was developed to overcome the drawbacks of using two separate sets of equipment for DC inversion and AC step-up in a PV power system: the larger volume of site work and the higher electrical losses.

The unit comprises a low-voltage section, a high-voltage section and a transformer section. Its distinguishing layout is that the low-voltage and high-voltage sections are arranged one behind the other, with the transformer section located to the left or right of them. The low-voltage section collects the direct current generated by the PV system and inverts it to alternating current; the transformer section raises the low-voltage AC to high voltage; and the high-voltage section provides protection and metering for the high-voltage AC output.

In this way the integrated substation converts the energy produced by the PV modules, through inversion and step-up, into stable, usable electrical energy.

Applications

  • Utility-scale PV plants
  • PV inverter block stations
  • Distributed PV on industrial sites
  • Projects where site work and losses must be minimised
  • Grid connection of PV at 10 / 35 kV

Related products

Need a quotation for PV-ISU?

Send the required capacity, voltage and quantity — we will reply with a technical and commercial offer including delivery to Uzbekistan.